News & Events

North Halsted Street Bridge over Chicago River North Branch Canal
Phase II analysis, design, structural final plans,
read more
Cumberland Circle (Illinois Route 58 at Wolf Rd )
Modern roundabouts are different from rotaries or traffic circles. With a modern roundabout safely and efficiently circulates traffic by requiring the motorists to yield on entry rather than stop. Cumberland Circle will be redesigned based on Phase I studies that...
read more
41st Street Pedestrian Bridge over Metra Electric/CN and South Lake Shore Drive
Structural Design Of Approach Structures and Stairs The approach structures include the outer portions of the structure which cross over the recreational parks on each side of Lake Shore Drive and railroad. The main structure will be supported by a single-deck rib...
read more
Loyola University Ignatius House
Student Housing
read more
US Route 30 over the Rock River (Rock Falls, Illinois)
A routine inspection was performed for this 8-span steel plate girder bridge (142’-8” Spans 1 and 8 / 134’-6” Spans 2 thru 7; 1097’-7” total length back-to-back abutments) with 43’-2"-wide reinforced concrete deck. The East and West Abutments are stub abutments...
read more
Wabash Avenue Improvement Project
Chicago vaulted sidewalks improvement and repair
read more
Chicago Transit Authority’s (CTA) 95th Street Terminal
Reconstruction of CTA Redline 95th Street Station
read more
I-90/94 and I-290/Congress Parkway (Jane Byrne Interchange), Phase I/Phase II Project
Chicago’s Circle Interchange Redesign
read more