Mechanical Equipment Support

Project Location

Chicago, IL

Services Provided

Phase I & II

Project Owner

Various

Project Duration

6 months

Project Duration

8 Years

Reference Information

Elara Engineering Steve D. Maize 30 N Wolf Rd #2Hill side, IL 60162

Key Team Members

Moussa Issa, Structural Engineer John Saraceno, Staff Engineer

HBM’s role in this project included structural engineering services that were required in the replacement of mechanical equipment specifically in high rise buildings.

HBM’sscopeincluded inspection, analysis of existing structures, design of all structural elements to support the mechanical equipment, production of structural drawings and specifications, review of shop drawings, and coordination. Below are a few types of projects:

  • Design of roof HVAC support structures and floor slab openings for high-rise commercial buildings in Chicago, IL
  • Design of roof HVAC support structures and floor slab openings for high-rise residential buildings in Chicago, IL

Various Project Locations:

  • 6339 N. Sheridan Road, Chicago, IL 60626
  • 2650 N. Lakeview Avenue, Chicago, IL 60614
  • 653 N. Kingsbury Street, Chicago, IL 60654
  • 21 E. Huron Street, Chicago, IL 60611
  • 30 E. Walton Street, Chicago, IL 60611
  • 5550 S. Dorchester Avenue, Chicago, IL 60637
  • 5415 N. Sheridan Road, Chicago, IL 60640
  • 1350-1360 N. Lake Shore Dr, Chicago, IL