HBM-ISTHA-Elgin O’Hare Western Access-converted
Project Location
Route. 390
Arlington Heights Rdto Lively Blvd
Services Provided
Design Section Engineering Services and Construction Management Design Support during the Construction
Project Owner
Illinois State Toll Highway Authority
Contract Number
I-12-4040
Contract Amount
$835,925
Prime Consultants
URS Corporation Mohammad Hassan, PE, SE Currently with JACOBS (312) 612-7270
Project Contact
Moussa A. Issa, PhD, PE, SE Project Manager (708) 236-0900
Project Duration
April, 2013 –2016(Constructed)
Key Team Members
Moussa A. Issa, Project Manager Joseph Glennon, Civil Project Engineer Mahmoud A. Issa, Structural Project Engineer Dan Abraham, Senior Civil Engineer Lisa Buntin, Structural Staff Engineer John Saraceno, Structural Staff Engineer
Description of Work
This project included the design of a segment of new controlled access expressway. The roadway is six lanes wide and located on unimproved and partially improved land in the County of DuPage within the suburbs of the Chicago near O’Hare International Airport. The roadway is located between Arlington Heights Road on the west and Lively Boulevard on the east. The expressway will be a tolled facility under the ownership of the Illinois State Toll Highway Authority.Local and frontage road improvements are included and will be under the jurisdiction of the local municipality or the County of DuPage. Some major features of the project included in this segment of improvements is the design of 1.62 miles of six lanes of pavement and shoulder, two new interchanges located at Wood Dale Road and Prospect Avenue, dual bridges over Salt Creek and Prospect Avenue, single bridge carrying Wood Dale Road over IL 390 (EOWA), retaining walls at various locations, new toll plaza, right-of-way acquisition, utility relocation, local road improvement, signalized intersection design,frontage road design, major drainage system design, includingdetention ponds, compensatory storage areas, watershed rerouting, major storm sewers, local sewer system rerouting and improvements, maintenance of traffic, safety improvements, lighting and highway signing. Construction will be via multiple construction contracts.
- Wood Dale Road Bridge over IL Rte. 390 (EOWA)
- Drainage and Civil SupportServices
- Design of four (4) Retaining Walls
Description of Scope of Work:
HBM developed storm drainage and underdrain plans, specifications and details for 1.62 miles of expressway based on drainage analysis provided by URS and reviewed by HBM. Work included major and minor storm sewers, details of control structures, highway ditch plans and profiles, underdrain plans and outfalls structures into Salt Creek.
HBM designed Wood Dale Road Bridge over IL. Rte. 390 (Elgin O’Hare Expressway Western Access). Design services included the development of TS&L Plans, final Construction Plans and Special Provisions for the new bridge. The proposed bridge will be a two span structure with integral abutments, wingwalls and center pier. The bridge is considered a Gateway Structure. In cooperation and cost sharing with the City of Wood Dale, the bridge includes a variety of unique architectural feature in order to enhance the aesthetic. In orderto accommodate local traffic on Wood Dale Road during construction, the bridge will be constructed in stages and temporary soil retention system will be used. The bridge alignment is on tangent. Other structural tasks include the design of earth retaining walls at various locations.